Michmas
globe-backer_1
page-banner-shape-2

Case Studies

page-banner-shape-1
page-banner-shape-2

Case Studies

4Smart Card Switcher for CISCO (NDS)

4Smart Card Switcher for CISCO (NDS)

Project Overview CISCO (NDS) required a device capable of authorizing access using up to four different…

IR Landing and Anti-Collision Lights for IAI – Lahav Division

IR Landing and Anti-Collision Lights for IAI – Lahav Division

Project Overview The Lahav Division of IAI required advanced infrared (IR) landing and anti-collision lights for…

MOSP 3000 for Israel Aerospace Industries (IAI) – Tamam Division

MOSP 3000 for Israel Aerospace Industries (IAI) – Tamam Division

Project Overview The Tamam Division of Israel Aerospace Industries (IAI) required a compact yet robust electronic…

Master 9 Instrument for AMPI

Master 9 Instrument for AMPI

Project Overview AMPI sought to develop the Master 9, a specialized instrument designed to stimulate tissues…

APS3 Development for Intel Corporation

APS3 Development for Intel Corporation

Project Overview Intel Corporation required specialized support equipment to assist their developers in signal monitoring and…

Free Consultation

Book A Free IT Consultation

It is a long established fact that a reader will be distracted the readab content of a page when looking at layout the point.

Phone: 561-555-7689
Address: New Jesrsy, 07023, USA